# Commercial EPC upgrades by building type

> The measure that matters most is different in a warehouse, an office, a cold store and a care home. One page each, covering what actually differs.

Source: https://commercialepcupgrades.co.uk/buildings

---

# The decision is different in each building type

Not the same page with the noun swapped. In a cold store, lighting is paid for twice. In a care home, there is no empty window to work in. In a listed building, consent rather than capital sets the ceiling. Those are different problems with different answers.

Each page below had to name something true of that building type and of no other before it was written. Where it could not, the page was not built, which is why there is no separate page for a distribution centre or a shop.

## One page each, and what only that page says

The line under each is the thing that page covers and no other page on this site does.

12 entries

Next step

## Find out what your building actually needs

Tell us the building type, the floor area and the rating you are on now. One commercial contractor comes back to you with a quote. No panel, no cold calls.

Or call [07367 293494](tel:+447367293494). Monday to Friday, 9am to 5.30pm.
