Insulation and fabric

Insulation and building fabric in a commercial EPC upgrade

Fabric is the measure everyone recommends and almost nobody does first. It is expensive, disruptive and slow to pay back. It is also the only thing on this list that cannot be switched off, misconfigured, left on overnight or quietly removed by a tenant, and it keeps working for the life of the building.

Usually the worst value per pound, and the longest-lived

A+ A B REQUIRED C D THIS BUILDING E F G
Band letters as they appear on a non-domestic certificate. Your own bands are on your EPC.

Why it scores better than it pays

A non-domestic EPC is an asset rating of the building and its services, not of your metered use, and fabric is a large part of what that model looks at. Improve it and the rating moves meaningfully. The problem is simply that the capital involved is high and the energy saved per pound spent is lower than almost anything else available.

That gap between what it does to the certificate and what it does to the payback is why fabric usually belongs to a refurbishment rather than to an energy project. When the scaffold is already up and the roof is already coming off, the marginal cost collapses and the decision reverses.

The cheap end people skip

Not all fabric work is a re-clad. Several of the cheapest measures in any building are fabric measures that nobody thinks of as fabric.

  • Loft and roof void insulation where there is a void to get into, which is ordinary materials and labour and nothing else.
  • Draught-proofing around doors, loading bays, service penetrations and roller shutters, which on an industrial unit can be a very large uncontrolled air path.
  • Insulating the perimeter of a heated space that abuts an unheated one, which is common where buildings have been subdivided.
  • Fast-acting or air-curtain protection at doors that stand open through a working day.

On an industrial building, the gap under a roller shutter is frequently worth more than any amount of wall insulation, and costs a fraction of it.

When fabric is unavoidable

If you are several bands below where you need to be, and the lighting and the plant are already good, fabric is what is left. That is the honest answer, and it is usually also the point at which the conversation becomes a refurbishment conversation rather than an energy one.

It is also unavoidable where a building is physically uncomfortable. No amount of efficient heating fixes a building that cannot hold the heat.

The trap: doing it in the wrong order

Improving fabric changes the heat demand of the building, which changes the correct size of the heating plant. Replace the boiler first and then insulate, and you own a boiler sized for a building that no longer exists, running inefficiently at part load for the next fifteen years.

If both are on the list, fabric is specified first even if it is installed second.

Questions we get asked

Is insulation worth it for an EPC rating?
It moves the rating well, because fabric is a large part of what the assessment models. It pays back slowly compared with lighting or controls, so it usually belongs to a refurbishment where the access cost is already being paid rather than to a standalone energy project.
What is the cheapest fabric measure?
Usually draught-proofing and door protection, particularly on an industrial unit where a roller shutter standing open is an enormous uncontrolled air path. Loft and roof void insulation is next, where there is a void to work in.
Should we insulate before replacing the boiler?
Specify the fabric first, even if it is installed second. Insulating changes the heat demand and therefore the right size of plant, and a boiler sized for the old building runs inefficiently at part load for its whole life.

Last updated .

Next step

Get insulation and fabric priced for your building

Tell us the building type, the floor area and the rating you are on now. One commercial contractor comes back to you with a quote off a survey.

Or call 07367 293494. Monday to Friday, 9am to 5.30pm.

A+ A B REQUIRED C D THIS BUILDING E F G
Call Get a quote